Past Event

Webinar Talk On “Problem Solving in Tunnelling Projects Using Numerical Modelling”
Venue: Digital Platform
Date & Time: 16 Nov 2021 (2:30 PM - 4:30 PM) Closed
CPD: 2
Closing Date Before: 13-Nov-2021 (Subject to change based on availability of seat)
Organised By Technical Division - Tunneling and Underground Space Engineering (TUSTD)

SYNOPSIS

Numerical analysis plays an important role in the design of tunnels, particularly where difficult ground conditions or construction restraints are expected. A successful numerical prediction of the performance of a supported excavation can lead to cost saving and safe construction. This webinar presents case studies of tunnelling projects in which technical difficulties were resolved employing numerical modelling in design and construction stages. The first case study addresses the use of deep soil mixing and cutter-soil-mix as an earth retaining system to enable the construction of cut-and-cover road tunnels in an urban area. 2D and 3D Finite Element (FE) modelling demonstrated the effectiveness of the ground improvement design concept, which was based on a conventional stability assessment. The FE modelling facilitated optimisation of the earth retaining system in firm clay. The second case study considers staged excavation of a railway tunnel at a shallow depth, constructed using NATM tunnelling techniques. The numerical modelling investigated the behaviour of canopy tubes, adopted to reduce the impact of tunnelling-induced subsidence on adjacent power pylons. The 3D FE model for the railway tunnel included the sequence of top heading and benching and the installation of canopy tubes. The third case study describes a coupled transient flow-deformation back analysis, used to predict the ground settlement due to water ingress into the excavation during TBM cutter-head-intervention. The back analysis aided the management of water recharge to avoid intolerable ground subsidence.


BIODATA OF SPEAKER

Ir. Soo Wai Yee (Waiyee) has 19 years of experience in tunnelling and deep excavation. Her experience includes metro, cable and utility tunnel projects in Singapore, KVMRT L2 UBW in Kuala Lumpur, East-Coast Rail Link in Malaysia, City Rail Link cavern tunnel in Auckland, NEOM Spine Line NATM tunnels in Saudi Arabia, Sydney Metro as well as Metro Manila Subway tender supports. Her key expertise includes advanced numerical modelling for ground-structure interactions, design of tunnel support systems, and constructability evaluation. Wai Yee graduated from University Malaya (Civil Engineering, 2002) and obtained Master of Science in Geotechnical Engineering from National University of Singapore (2013). She is registered Professional Engineer in Malaysia and Queensland, Australia, and Chartered Engineer with Engineers Australia. She is currently based in Brisbane, working as Technical Director (Tunnels & Underground Spaces) in GHD.



Limited to 370 participants only (first come basis) and confirmation email will be sent for successful registration latest by 15 November 2021 @ 5.00 PM


Additional Information
Posted on
 
 
Webinar Talk On “Problem Solving in Tunnelling Projects Using Numerical Modelling”
Flyer

01-Nov-2021
Download
Post Comment
 
Member Type Normal Rate
(RM)
Online Rate
(RM)
DISTINGUISHED HONORARY FELLOW 18.87 14.15
HONORARY FELLOW 18.87 14.15
FELLOW 18.87 14.15
DISTINGUISHED MEMBER 18.87 14.15
SENIOR MEMBER 18.87 14.15
MEMBER 18.87 14.15
HONORARY MEMBER 18.87 14.15
SENIOR GRADUATE 18.87 14.15
GRADUATE 18.87 14.15
INCORPORATED MEMBER 18.87 14.15
AFFILIATE 18.87 14.15
ASSOCIATE MEMBER 18.87 14.15
ENGINEERING TECHNOLOGIST GRADUATE 18.87 14.15
ENGINEERING TECHNICIAN GRADUATE 18.87 14.15
Non IEM Member 47.17 47.17

For IEM members, please CLICK HERE to login for member rate
Rate stated does not include 8% SST
Non IEM Member will be charged an additional RM 20.00 Admin Fees inclusive 8% SST.




Advertisement


Advertisement

Advertisement

Advertisement
Survey Form


NEWSLETTER

Sign up for our newsletter to receive more information
Name:

Email Address:

Follow Us